Wachovia Corporate Center
Charlotte, NC
LEED Registered Corporate Headquarters located in a $1 Billion+ multi-use development. The infrastructure package is complete. The fit-out package is scheduled for completion in 2010. The facility will include a 48 story office tower to house Wachovia Corporate Investment Bank (CIB) division plus a 9 story podium building to house up to 2500 traders, central mechanical plant and 24,000 SF Tier IV Data Center. Total fit-out area more than 825,000 SF. Future occupancy of 4,500 employees.
Mechanical Overview
- 5300 ton chiller plant (2N)
- 40,000 gallon chilled water storage
- Two 15,000 gallon fuel oil storage & one 10,000 gallon receiving tank provides 48 hour back up
- Full compartmentalization of chiller plant, including HVAC equipment and piping, fuel storage, fully redundant critical systems BMS and fuel oil risers
- CFD analysis
- Underfloor air distribution for trading floors
Electrical Overview
- Dual Duke Power 25KV utility services feeds (2N)
- Main 12.47KV distribution to multiple double-ended substations
- Seven 2.25 MW-12.47 KVA generators to support data center and trading
- Dual generator paralleling switch gear (A&B) in separate compartments
- Twelve 750 KVA UPS modules configured as four separate parallel redundant systems (2N)
- Electrical Power Monitoring System
Fire Protection Overview
- Pre-Action system for Data Center, Demarc Rooms and Electrical equipment rooms
- FM-200 systems for data center and demarc rooms
- Air Sampling Smoke Detection (ASSD) in Data Center
Plumbing Overview
- Waterless Urinals
- Rainwater Harvesting
- 340,000 gallon cooling tower make-up water storage provides 48-hour back up
- 80,000 gallon domestic water storage provides 48-hour back up